If you are building a new house and want rooftop solar, plan it at the design stage rather than after the roof is finished. Since February 2026, new solar connections in Pakistan fall under NEPRA's net billing rules, which pay much less for electricity you export than the old net metering system. That makes it more important to size the system for your own daytime use and to design the roof, wiring and structure so the panels fit cleanly and safely.

This guide explains what changed in the rules, what it means for a new house, and the practical decisions to make with your architect and contractor before the roof slab is poured.

What changed for rooftop solar in 2026

On 9 February 2026, NEPRA notified the NEPRA (Prosumer) Regulations, 2026, replacing the 2015 net metering regulations. As reported at the time, the key changes for new solar users were:

  • Net billing instead of net metering. Under the old system, a unit exported to the grid broadly offset a unit imported. Under net billing, electricity you take from the grid is charged at your normal consumer tariff, while electricity you export is bought at a separate, lower rate linked to the national average energy purchase price.
  • A much lower export rate. Reports in February 2026 said the rate for new users would fall to roughly a third of the previous rate. The exact figure is set and revised by the regulator, so check the current rate with QESCO rather than relying on an old news story.
  • Shorter agreements. The standard agreement term was reported as five years instead of seven, renewable by mutual consent.
  • Size limits. Reports said system capacity is limited to the consumer's sanctioned load, with a maximum of 1 MW, and that new connections may be refused where existing generation on a transformer is already high.
  • Existing users protected until expiry. After the Prime Minister ordered a review, NEPRA said existing net metering consumers keep their current agreements until those agreements end. New connections and renewals fall under the new framework.

For someone building a new house, the practical message is simple: rooftop solar can still reduce your bills, but the savings now come mainly from using your own solar electricity during the day, not from selling surplus units to the grid.

Planning rooftop solar for a new house: size for your own use

Because exported units are worth less than imported units, the best-value system for most homes is one that matches daytime consumption rather than the largest system the roof can hold.

Estimate your daytime load

List the appliances that will run while the sun is up: the water pump, fridges, fans or air conditioners in summer, the washing machine, iron, computers and any home office equipment. If you are moving from another house, your past electricity bills give a useful starting point. A qualified solar installer should turn this into a recommended system size; ask them to show the calculation.

Move flexible loads to daytime

Some loads can be shifted: filling overhead water tanks, running the washing machine, ironing and charging devices. Planning separate circuits and a sensible pump timer during construction makes this easier later.

Decide early whether you may add batteries

Batteries let you store daytime solar for the evening, but they add cost and need a ventilated, shaded, dry space. Even if you do not buy batteries now, choosing a hybrid-capable inverter and leaving space and cable routes for them keeps the option open.

Design decisions to make before the roof is built

Many rooftop solar problems on houses come from treating it as an afterthought. These are the points to settle with your architect and contractor during design.

ItemWhy it mattersWhen to decide
Clear roof areaStair towers (mumty), water tanks and parapets cast shadows that reduce output across a whole string of panels.Architectural drawings
Frame anchoringPanel frames must resist wind and earthquake loads without damaging waterproofing.Structural design, before the slab
Cable routeA dedicated conduit from roof to inverter avoids exposed cables and later wall chasing.Grey structure stage
Inverter and battery spaceEquipment needs ventilation, shade, dryness and access for service.Floor plan
Earthing and protectionProper earthing and surge protection protect the equipment and the people using the house.Electrical design
Roof access for cleaningDust reduces output; panels need safe, regular access.Architectural drawings

Keep the roof free of shade

Mark the panel area on the roof plan first, then place the water tank, stair tower and any satellite dish or chimney so they do not shade it. In Pakistan, panels generally face south for the best year-round output; your installer will confirm the tilt and layout for your roof.

Plan the frame and waterproofing together

Raised steel frames are common on flat roofs because they keep panels clear of the roof surface and allow space underneath. The frame must be anchored for wind and, in an earthquake-prone city like Quetta, for seismic movement. Ask the structural engineer how the frame will be fixed and how each fixing will be sealed so the roof does not leak. Fixing frames before final roof waterproofing, or using ballasted or pre-cast footings, is usually easier than drilling into a finished roof. Our guide to building for Quetta's climate and earthquake safety covers the wider structural points.

Leave conduits and an equipment space

Run at least one dedicated conduit from the roof to the planned inverter location while walls and slabs are being built. Place the inverter somewhere shaded, ventilated and away from water tanks and kitchens, with enough space for a future battery. These are cheap during the grey structure stage and disruptive later.

Think about cleaning and water use

Dust settles quickly on panels in dry areas. Plan safe roof access and a nearby tap. Where water is scarce, soft dry brushing and occasional rinsing usually work better than frequent washing.

Getting a grid connection under the 2026 rules

If you want to export surplus electricity, you will need an agreement with the distribution company. In Quetta and most of Balochistan this is QESCO. Based on the February 2026 reports, the general process involves:

  1. 1Choosing an installer and system size within your sanctioned load.
  2. 2Applying to the distribution company with the required documents and technical details.
  3. 3A technical review and, where needed, NEPRA concurrence with a fee.
  4. 4Installation of a two-way (bidirectional) meter, with interconnection costs paid by the consumer.
  5. 5Signing the net billing agreement.

A new house usually needs its own permanent electricity connection before any solar agreement can be signed, so allow time for both. Ask your installer which documents QESCO currently asks for, and get the expected timeline in writing.

Does rooftop solar still make sense for a new house?

It can, but the answer depends on your usage, the equipment prices at the time and the tariff you would otherwise pay. We do not quote payback periods, because they change with tariffs, export rates and equipment prices. Instead, ask any installer for:

  • A written estimate of how much of the system's output you will use yourself.
  • The assumed tariff and export rate, with the date of those figures.
  • Equipment brands, warranties and who handles warranty claims.
  • Who is responsible for the frame design and roof sealing.

Compare at least two quotes on the same basis. If a seller promises a fixed income from exporting electricity, treat that as a warning sign under the current rules.

How NASASI Estate helps

NASASI Estate provides construction services and advisory support for homeowners in Quetta. We can help you plan roof layout, structural fixings, conduits and equipment space during design so solar can be added without rework, and coordinate with your chosen installer. If you are still at the approval stage, our guide to building plan approval in Quetta explains the steps. To discuss your project, contact us.

Frequently asked questions

Can a new house still get net metering?

According to the February 2026 reports, new connections now come under net billing, while existing net metering agreements continue until they expire. Confirm the current position with QESCO before signing anything.

Should I install solar during construction or after moving in?

Plan it during construction. You can buy panels later, but roof layout, frame fixings, conduits and equipment space are far easier and cheaper to build in from the start.

Do I need batteries?

Not always. Batteries help if you use a lot of electricity in the evening or face frequent outages, but they add cost and maintenance. A hybrid-capable inverter and space for batteries keep the option open.

Will solar panels damage my roof?

They should not if the frame is designed properly and every fixing is sealed. Most leaks come from fixings drilled into a finished roof without proper waterproofing, which is why this should be planned with the structural design.